Refurbishment Loading Bay

The Problem:

On a wet concrete loading bay, a major slip hazard existed and the client was very concerned that a forklift truck would be involved in an accident.

Requirement:

The disruption to the operation by carrying out the refurbishment needed to be kept to minimum. Also the system had to be both hard wearing and very effective when wet.

Solution:

By applying a fast curing polymeric system incorporating a very hardwearing aluminium oxide aggregate in chevron pattern a long life high traction surface was created.

Benefit to the Client:

  • Minimal disruption to operation
  • Cost effective long term solution
  • Safe working environment