Lead Gutter Lining

The Problem

Years of atmospheric attack and pollution had caused the lead roof of a prestigious school building to deteriorate badly and leak.

Requirement

The cost of replacement was prohibitive and the client was looking for a long term cost effective system to renovate the total guttering system.

Solution

A liquid applied fully reinforced lining was installed. This provided a seamless fully bonded overcoating to the lead.

Benefit of the Client

  • No disruption during installation
  • Long term waterproofing solution
  • Extended life expectancy
  • Outstanding environmental protection