The concrete structure had suffered damage from the surface preparation system used to remove the decorative coating system. The resultant surface had to be smooth before the new coating could be applied.
To apply a “skim-coating” to stair treads, risers and landings to provide a perfectly smooth hard-wearing base for the paint system.
The surfacing works were carried out using a high bond-strength polymer-screeding rebuilding system. This was capable of being applied from 0.25mm up to 6mm in one coat.
View Our Latest Case Studies
D+R Maintenance Solutions
Quick Links:
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |